Nhà
>
các sản phẩm
>
Rack Roll Forming Machine
>
Racking shelf roll forming machine
|
Serial No. |
Commodity & Description |
Quantity |
|
1 |
5T manual uncoiler |
1 set |
|
2 |
Leveing guiding |
1 set |
|
3 |
Servo feeding device |
1 set |
|
4 |
Punching machine |
1 set |
|
5 |
Main roll forming machine |
1 set |
|
6 |
Hydraulic station |
1 set |
|
7 |
Cutting device |
1 set |
|
8 |
Finished products tabel |
1 set |
|
9 |
PLC control system |
2 sets |
|
10 |
Out tables |
1 set |
|
11 |
Spare parts | 1 set |
Working Flow of Roll Forming Machine
A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)
B.Servo Feeding Applicator............................................To feed the material accurately
C.Hydraulic/Press Punching...........................................To punch as requirements
D.Roll Forming Unit.........................................................To roll form as requirements
E.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
F.Output Table................................................................Support the finished products
Uncoiling—Feeding&Leveling-Punching--Roll forming—Cutting—Products collecting
![]()
Advantage of machine
1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable
Profile of product
![]()
Photo Gallery
![]()
![]()
![]()
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Liên lạc chúng tôi bất cứ lúc nào